Project Overview
This project is an e-commerce startup going by the name Health Tactical that looks to sell groceries and common goods with a special focus on health aspects. The platform will sell products targeted at health and wellbeing-conscious individuals. The website will provide a convenient online store where enthusiasts of different health and wellbeing trends can find their preferable products and supplements. To this end, the site will sell organic food, diet supplements and related products.
This project looks to supply these individuals with the food and supplementation they need. Further, the platform will act as a middleman between these followers and suppliers of the desired goods. This ties in with the projects major goals including:
-
Allow health and wellbeing enthusiasts easy and fast access to products.
-
Offer convenient shopping.
-
Increase the market reach of local suppliers.
-
Cater to different health trends.
Information technology (IT) has a significant role to play and is directly tied to the success of the platform. The project is wholly dependent on IT to be created, hosted, and maintained. IT will allow for the automation of different aspects of business that will make it easier to handle customers, process their orders, track inventory, and cater to a large number of people. Further, IT will facilitate information dissemination as customers will be able to compare between the different products and trends.
Functional Business Requirements (Scope) and Scope Control
Scope Control
The team realizes that change is inevitable, and the scope of the project is bound to be static over the development life cycle. It is for this reason that there are several approaches and contingencies to ensure the change does not overwhelm the successful delivery of the final product. To this end, we will leverage technology, communication, best practices, and resources (Hassan & Asghar, 1). The projects scope will be mainly affected by time and cost, and the first step is to keep these variables under control. The scope will be kept in check by allowing a maximum deviation of 10% in time and cost. A larger deviation will prompt the review of the whole project and redesigning of the schedule and work plan if it emerges that the components that increased scope are essential and might have been overlooked. All changes due to a deviation above the 10% threshold will have to be approved by top management.
We will control the scope by creating an exhaustive project specification that features all the components needed by this type of platform. The list will include all conceivable features and components that will then be narrowed down to the most important and necessary ones. The specification will be created in collaboration with industry experts to ensure no element is left out. Further, the project will be developed in line with best practices to ensure we use the least amount of resources and time. Following proven methods and approaches will give room for any unanticipated elements and ensure they are completed as fast as possible. Only changes to primary components will be incorporated; changes to non-essential features and components will be made after project completion.
Change control will manage changes to the scope identified in this document. Any changes affecting project costs and timelines require business owner approval.
Non-functional Business Requirements (Governance, Risk, Compliance) (1 page)
Governance
Non-functional business requirements related to governance include: Ease-of-use, Accuracy, Reliability, and Efficiency. The platform has to be intuitive to use for any new administrator or back-end user. This means that it does not require specialized or highly technical knowledge to operate. The system must also give the correct feedback when prompted to reduce errors and mistakes. Further, the system has to perform well and give quality feedback consistently whenever it is operational. Finally, the system has to perform at a high rate with minimum resources.
Risk
Non-functional business requirements related to risk include: Security, Availability, and Safety. The platform should always be safe and unthreatened by attacks from malicious parties. The system should always be online unless stated prior to being taken offline. Users should always be able to access the platform at their convenience without any problem. The system should also be protected from harm or loss.
Compliance
Non-functional business requirements related to compliance include: Security, Safety, Confidentiality, and Accessibility. The law requires that such a platform be unthreatened by malicious parties that would want to acquire user data and disrupt service. In addition, the system should be adequately protected from any unintended loss or harm that might inconvenience users. All user information stored on the website should not be accessible to the wrong parties and users should be able to log in whenever they desire.
Revision
Non-functional business requirements related to compliance include: Flexibility, Maintainability, Modifiability, and Scalability. The system should be robust and not break easily when under stress. Features and components should be easy to keep running and operational. Also, they should be easy to change, remove, add or update as needed. Finally, the system should be easy to replicate in a range of similar scenarios.
Technical Requirements for Integration of E-commerce Components
Performance this requirement does with the systems handling of its functions under given conditions. Instances include execution time, throughput, workload, and speed of response (Gralha et al., 2). The programming language used has to do well in all the listed aspects. Such a language would ensure all components work together seamlessly as there will be no conflicts, bottlenecks and similar issues that would undermine integration.
Real-time Data Availability the system should be able to avail data when it is needed. In other words, each components access to data is always fast and uninterrupted. Therefore, the systems workload should be always optimized and use software-defined storage as much as possible. Data should flow through the application fast and seamlessly at all times.
Flexibility the system should be able to adapt to changes in usability and environment requirements without needing structural changes. The system should allow interfaces that integrate both current and future components. This means that it should be a system that can handle components in their various forms and types without needing any significant changes.
Reliability the system should be able to perform as intended for the life of the platform. The system will be created to offer seamless interfacing between the different components and should do the same without failure as long as the website is live. Failure to meet this requirement will compromise integration.
Accuracy successful integration needs correct and precise data. One components function is often reliant on another components output so it is crucial that the information exchanged is free of error. This is to say that the information a component receives has to be the exact information sent from another.
Potential Risks, Constraints, and Assumptions
Risks
-
Budgeting Issues Financial issues are one of the biggest hurdles that stand in the way of successful project management (Alves et al., 3). Budgeting issues in this project can occur because of missing cost categories or the budget is based on a weak foundation. The budget may fail to reflect all costs it will incur or the project schedule, effort estimates, and resource estimates may be way off.
-
Inadequate Skills of Team Members the development teams performance is highly dependent on the skill levels of individual members (Menezes et al., 4). The team or some members might lack the skills needed to solve the challenges that will lead to the realization of the project and cause significant delays or even a complete halt.
-
Unrealistic Deadlines the end products quality is highly susceptible to the adequacy of allocated time and impossible deadlines undermine the same. Such deadlines are usually the result of overestimating the capability of the development team and negotiating or setting too short turnaround times (Menezes et al., 4). This problem can also arise because of the project managers allocation of inadequate time to specific crucial application tasks.
-
Scope Creep scope creep is always expected in all types of project. Scope creep can be beneficial sometimes but often the disadvantages outweigh the advantages by far (Alves et al., 3). A significant majority of teams face this issue and it is mostly at the hands of vague requirements. An unclear picture of desired outcomes is often to blame for this phenomenon.
-
Lack of Accountability projects run exceptionally when all team members have a sense of responsibility and try their best to fulfill the responsibilities of their role. This project will fail if some members of the development team do not have a sense of accountability.
Constraints
These constraints have been identified: Resources, Time, Cost, Scope. There are limitations on the projects deliverables, detail and quality. The project is also bound by a budget and costs attached to material, facilities, equipment, salaries, and miscellaneous expenses. Time constraints include time allocated for strategy and planning, internal calendars and milestones, hours worked on components, and overall project timeline. There are also constraints attached to the amount of resources the project can use. Resource constraints are attached to software, facilities, equipment, and people.
Assumptions
The most significant assumptions related to defining this project scope, objectives, and approach scope include: the scope of the project will not change over the life cycle, the overall project cost will not increase, team members will have all the requisite skills and capabilities, all needed resources will be available. Together, these assumptions led to the conclusion that the project will run smoothly from start to finish without any hitches.
Sources
Hassan, I. U., & Asghar, S. (2021). A framework of software project scope definition elements: an ISM-DEMATEL approach. IEEE Access, 9, 26839-26870.
Gralha, C., Damian, D., Wasserman, A., Goulão, M., & Araújo, J. (2018, May). The evolution of requirements practices in software startups. In 2018 IEEE/ACM 40th International Conference on Software Engineering (ICSE) (pp. 823-833). IEEE.
Alves, J. L., Ferreira, E. A., & de Nadae, J. (2021). Crisis and risks in engineering project management: A review. Brazilian Journal of Operations & Production Management, 18(4), 1-17.